Google Classroom구글 클래스룸
GeoGebra지오지브라 클래스룸

Average and marginal cost on total cost curve

Aedifico Ltd is a small construction firm. The total cost (TC, in £) and marginal cost (MC) of Aedifico's concrete depends on tons produced (Q) as follows: TC = Q³ - 9Q² + 40Q + 50 MC = 3Q² – 18Q + 40 The total cost curve has been plotted here, and the average cost (gradient of ray) and marginal cost (gradient of tangent) indicated. To see the marginal and average costs per ton graphed on their own axis, see http://www.geogebratube.org/student/m13348